DataCenter Feasibility Lab
Central Asia · 100 kW-5 MW IT load

Pre-feasibility decisions that can be traced and replayed

Screen one candidate site or first-phase load block before expensive engineering begins. Every number keeps its unit, formula and evidence status. Missing utility, tariff, land, water, fibre and vendor facts stay missing until an authorised source confirms them.

58 fieldsEvidence register with explicit status
41 outputsTraceable rows where inputs permit computation
4 scenariosCompared on the same IT-load basis
83 checksAutomated calculation and intake tests
Decision before design

Four questions the screen is built to answer

A useful pre-feasibility result narrows the next decision. It does not create false certainty.

01

Can this site support the load?

Grid capacity, delivery date, land, water, fibre and permit timing are tested against the agreed launch gate.

02

Which direction is worth engineering?

Economical, base, resilient and AI/HPC directions are compared on one load basis.

03

What changes the answer?

High-sensitivity inputs and stop factors are ranked so evidence work follows decision impact.

04

What must be confirmed next?

Each unresolved fact names the required document, owner and effect on the decision.

Evidence discipline

A value is only as strong as its status

The model separates authorised facts from benchmarks and assumptions. It never promotes missing data into a verified project input.

StatusMeaningHow it appears in the memo
documentCurrent authorised document or quotation.File, date, page and validity recorded.
buyerExplicitly confirmed by the named decision owner.Author and confirmation date recorded.
benchmarkIndustry reference, not a site fact.Range and sensitivity only.
assumptionTemporary input used to continue the screen.Visible in the assumption register.
missingA decision-critical value has no evidence.Blocker or explicit sensitivity.
conflictAuthorised sources disagree.Held until the conflict is resolved.
Replayable by design The delivered input snapshot and model version reproduce the displayed calculations within shown rounding. AI may assist collection and explanation; deterministic functions calculate the outputs.
Decision pack

What the buyer receives

01

Evidence register

58 inputs with source, status, owner and date.

02

Scenario comparison

Four architecture directions on one load basis.

03

Stop-factor brief

Blockers and sensitivities ranked by decision impact.

04

Bounded memo

A proceed / hold / reject result with the next evidence gate.

05

Model snapshot

Replayable inputs, version and traceable output rows.

06

Review session

A 60-minute replay with one decision owner and reviewer.

Current proposed pilot

Start with one narrow readiness screen

The price applies only to the bounded pilot below and becomes binding only through a written scope accepted by both parties.

FIXED PROPOSAL USD 5,000

One candidate site or one first-phase IT-load block between 100 kW and 5 MW.

  • Target: five working days after signed scope, minimum input pack and cleared mobilisation payment
  • Proposed payment: 50% mobilisation, 50% before final memo and snapshot release
  • A clean proceed, hold or reject result can each satisfy acceptance
Boundaries

What the screen does not provide

  • No working drawings, BIM/IFC, detailed electrical, hydraulic or protection design.
  • No utility capacity, tariff, land, water, fibre, vendor or schedule guarantee.
  • No permit, procurement decision, uptime promise, Tier certification or regulatory approval.
  • No licensed survey, fire or industrial-safety sign-off, engineering certification or construction supervision.
Next step

Bring one decision, not an entire project

Send the intended IT load, location and the decision that must be made. The first reply will identify the three evidence items needed before the rest.